Increase text Decrease text Print this page Email this page

Automatic line for 2 and 3 bumps crash barriers production

Line able to produce crash barrier 2 and 3 bumps production with the same machine.

OMM provide wide and flexible solutions by its new Automatic Line for 2 and 3 Bumps Crash Barriers Production with cutting and punching on fly high accuracy making suitable this machine for barriers production plant.

OMM’s Automatic Line for 2 and 3 bumps crash barriers can easily be operated and carried thanks to its user friendly interface.

The process starts from coils properly trimmed to measure for the 2 and 3 bumps that become loaded on the decoiler drum. The ribbon advance up to meet the shearing machine where is cutted the initial part and the final part of the coil for the following joining because will come welded the end of the coil in process with the initial part of the new coil in feeding this means to save time. Then there is a movable profiling machine that translate on rails in base to the production to do because the same profiling machine can realize barrier with 2 bumps or barrier with 3 bumps that means to have only one line and produce the complete production range so to save money.

The machine has been designed to accept the flattened sheet and to cold forming giving a profile conform the ASHTOO - RAL A – RAL B and SINA norms.

After the forming machine follows a truck motorization group for punching side slots, central slots and the barrier cutting. During the blank sliding the truck motorization group slides on guides starting to still to chase the position of the sheet so at the same time in only one descent stroke become made the side slots, the central slots and the barrier cutting through hydraulic cylinders.

After this station the barrier is ready to go on the unloading station for the following stacking and unloading.
The barriers packs are ready to be galvanized.

TECHNICAL & MAIN FEATURES

- Only one Operator for the line management;
- Real time data monitoring system & teleservice through internet or GSM connection;
- Production rate approx.: 22m/min. (=5 parts/minute)
- Number of parts made from one coil 120
- Coil changeover time: ca.10 minutes
- Max Tensile Stress: 480N/mm2 (70,000 psi) + 10%
- Material : Hot rolled steel, galvanized finished

This machine as all our machines/systems has been designed and manufactured respecting all the norms, in term of safety and respecting the environment (noise, fumes aspiration, energy recovery back), given by the European Community:

 



- Conforms to the disposition of the machine directive (directive 89/392 CEE), and following amendments (directive 91/368/CEE, 93/44/CEE, 93/68/CEE);
- Conforms to the disposition of the following other directives: directive low voltage (73/23/CEE) / electromagnetic compatibility (89/336/CEE).
    Request more information about this product     

Officine Meccaniche Murgesi
World Presence

Discover


FOCUS ON
 



Steel Lattice Towers Production Line

Steel Lattice Towers for Power Transmission up to 500 KV / Communication Towers - Square & Triangular / Radio Mast Towers / TV and Aerial Masts / Sub Statiion Structures / Gantries.

Discover steel lattice tower lines


FOCUS ON
 



Poles productions lines for
Conical Poles 5-15m / Standard High Mast / Special High Mast / Standard Tower Mast / Standard Tower Mast / Lighting Poles / Distribution Poles / Telecommunication Towers / Transmission Towers / Steel lattice Towers / Radio Mast

Discover our poles production lines